Clear quantities. Reviewable rates. Better construction planning.Explore the global TB platform
CONSTRUCTION ESTIMATING FOR SAUDI ARABIA

Before the bid.
Before the order.
Make the numbers clear.

From a villa slab to a fit-out package, understand the quantity, rate and assumption behind your next construction estimate.

Metric quantities · Editable rates · Purchase planning · Print-ready reports

Construction professionals reviewing plans in a contemporary Saudi urban construction settingEDITORIAL IMAGE · BUILDING IN SAUDI ARABIA
CONCRETE SLAB · WORKED EXAMPLE12.60 m³

10 m × 8 m × 0.15 m + 5%

Material subtotalSAR 3,780
Metric quantitiesEditable ratesPurchase planningPrint-ready reports
BEYOND A SINGLE TOTAL

A number you can trace.
A decision you can explain.

Keep measured scope, purchase quantities and rate assumptions visible from the beginning.

Measure the work

Calculate from dimensions and explicit units. Review concrete, blockwork, finishes and other quantities.

Question the rate

Use your quotations for the project location and specification. Keep currency, delivery and inclusions clear.

Prepare the resources

Explore purchasing, crew and equipment scenarios before committing to an estimate.

TRY THE BASIS YOURSELF

Change an input. Understand the effect.

Three browser-local demos with metric quantities and editable SAR example rates. No account needed.

Concrete slab: quantity & material cost

Adjust the dimensions, allowance and example rate. Review the formula behind the result.

Rates are illustrative inputs, not Saudi supplier quotations or market averages. Allowances are planning inputs, not specifications.

L × W × T
EXAMPLE MATERIAL SUBTOTAL
—

Build a detailed estimate in TB

This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.

BUILT FOR THE REVIEW CONVERSATION

Be ready when the next question is “what is included?”

A material quantity, a purchase order quantity and a complete installed cost are different things. Make the boundary clear before comparing offers.

  • Review the current drawing and measured scope.
  • Keep allowances and package rounding visible.
  • Separate materials from labor and equipment.
  • Carry the basis into a reviewable report.
Open a TB sample estimate
THE ESTIMATING PICTURE

From the drawing to the next decision.

A practical sequence for quantity, rate, purchase and report review.

Define the scope

Record the drawing revision, measured work and specification.

Review the rate

Use dated quotations in the correct currency and unit.

Plan the purchase

Separate allowances, whole packages and delivery assumptions.

Explain the estimate

Review included work, exclusions and the resulting report.

PRACTICAL GUIDES

Build a stronger estimating basis.

Guides
CONCRETE & MEASUREMENT

Before the concrete order, establish the volume.

A worked slab example in metric units and SAR, with the material subtotal separated from installation scope.

Read the guide
MASONRY & PURCHASE PLANNING

Turn a block-wall area into a purchase quantity.

Deduct openings, check the nominal block module and round the final order to whole units.

Read the guide
SAR ESTIMATES & QUOTATION REVIEW

A rate needs a source, a date and a scope.

Build a reviewable quotation basis for a Saudi project without treating example rates as market data.

Read the guide
GO BEYOND THE DEMO

Give your estimating work room to grow.

Choose an individual workflow or greater capacity for a connected team.

Business

A connected workflow for an estimating team.

  • Five named users, including the owner
  • Company membership and review controls
  • More project and library capacity
Choose Business

Enterprise

More capacity for a larger operation.

  • Fifteen named users, including the owner
  • Higher retained records and storage capacity
  • Room for a growing project portfolio
Choose Enterprise

Subscription prices are stated in USD on the main TB platform. Review current prices, capacity, billing period, automatic renewal terms and the final checkout total before subscribing. SAR amounts here are illustrative construction examples.

BEFORE YOU BEGIN

A few answers before the next step.

What does TB do for a Saudi project?

TB calculates construction quantities, helps plan material purchases, and supports editable cost and resource scenarios from supplied inputs. The Saudi edition explains those workflows with Arabic and English content and illustrative SAR examples.

Does this include current Saudi material prices?

No. The demo rates are examples only. Use your own dated quotations for the project’s city, specification, quantities and delivery terms. TB’s rate importer does not supply a licensed commercial rate dataset.

Does the demo check the Saudi Building Code?

No. Quantity calculations do not establish design adequacy or code compliance. Follow the approved project documents and consult the responsible professionals and current official Saudi Building Code resources.

Is the main application in Arabic?

This marketing site supports Arabic and English. That does not establish Arabic availability in the main application or checkout. Review the actual TB interface before subscribing.

Questions & answers

A CLEARER BASIS FOR YOUR NEXT PROJECT

Before the next commitment, understand the numbers.

Explore construction quantities, editable costs and resource planning in the main TrendyBuilders platform. Choose the working capacity that fits your operation.

A clearer estimate starts here.See plans